I want to finish (
see Part 1 here) telling you the story of my big summer project, one that had me working harder, physically, (and at almost 10,000’!) than I have in some time. I’m sure it’s not as riveting a tale for you, dear readers, as it is for me. But I appreciate the few of you who have stuck with me thus far!
After my first crew of helpers left, the prepping and priming was almost done. So I started in on the final painting by myself. As I mentioned in
an earlier post, we took the somewhat bold option of painting the railing a forest green, instead of continuing the trim color from the cabin. I hope you agree with me, as you see the job progress, that it was a good choice.
I started by doing mostly “cutting in,” that is, doing the brush work needed at the corners and junctions (of which there are loads on this railing!). That way I could finish up with the more fun roller work on the open surfaces.
One of the reasons I decided to do this was because of the unpredictability of the weather. We’ve had a lot more rain up here this summer so far than usual. And it often comes and goes during the day, which makes a painter skittish about doing wide swaths of the project unless she feels sure it will be sunny for a while.
Here’s a typical view looking up our valley from the road to town…
The periodic showers did slow the work down, but in a way they were sort of a blessing. The few whole sunny days had me working so many hours I was an exhausted, stiff/sore wreck by bedtime. Taking breaks when the rains came forced me to limit my hours and my 68-year-old joints were grateful!
At any rate a day or two after the departure of my first crews, my final pair of helpers arrived and the green painting work went much faster. (Again, sorry there are no pix of this group!)
After they left, I didn’t have much more initial coating to do, but the finishing up, touching up, and second coats where needed took several more days. But I think the finished product is worth the sweat (little blood and no tears, fortunately!)
However, the job wasn’t completely done. After the painting, the metal stock panels needed to be re-attached. At first I thought I should wait for our handyman’s help with this. But he’s been so busy since finishing our house with other jobs (that’s the problem when your guy does such good work!) that I decided I could try and do it myself. And as it turned out, except for a little difficulty getting the longer sections in place to be attached, it wasn’t too hard a chore.
Except for one section that needs another set of hands since it’s going to have to go on the outside, it’s all in place. (Which is especially good news since a toddler will be arriving soon to test its safety quotient!)
Whew! What a job. It could not of have been done without the help of my wonderful “crews” and their expertise and labor. But I still feel quite a sense of pride when I look out my windows and see how much nicer it looks than it did before.
There are still a couple of things that need to be done, and which will require additional help. For one thing, the stock panels need to be more securely attached with staples in addition to the screws and washers that I applied.
And there are two gates that we removed and painted. I kind of wish we’d left them in place, although the painting was a lot easier with them and their hardware off. However, I neglected to take “before” photos of how the hinges and hooks were attached. So now I think it’s wisest to wait for males with better spatial senses to help re-attach them. I’d probably put them on backwards!